Water Leisure Business Awards
Vote for your favourite
0 -1 -1 0 days
0 -1 -1 0 hours
0 -1 -1 0 minutes
0 -1 -1 0 seconds
Eco Product/Project of the Year
- View Entries
- Competition Rules
- Sort by:
- Category:
Competition Terms
- Any entry that does not adhere to the rules and regulations of the competition may be disqualified.
- The competition organisers make no assertion or indication that design, construction or safety considerations are evaluated in the course of the competition but any project known to not confirm to regulations will be automatically disqualified with no refund of entry fee.
- Projects/products/installations must have been completed during the five-year period prior to the entry deadline.
- An installation may be entered in more than one category.
- An installation may be resubmitted in subsequent competitions if it meets the competition eligibility and has not won an award in that category previously.
Photography Guidelines
- At least FIVE digital images and a maximum of TEN images. Each photo must show a different view of the installation. Please include at least ONE plant room image. (A plant room image will add points to your competition entry).
- Each photo must be in high resolution i.e. 300 DPI jpegs at least 500kb in size.
- Each photo to not exceed 2MB in size.
- Before and after pictures must be submitted for the Residential and Commercial Refurbishment categories.
- Images may not be enhanced or altered.
- Please note that any images submitted as part of an entry may be used for promotional purposes by the UK Pool & Spa Awards.
Disclaimer
- The UK Pool and Spa Awards is principally an aesthetic competition. Judging is based on information supplied by the competition entrant. Although basic information and testimonials are asked for, the competition organisers make no assertion and do not intend to indicate that design, construction or safety considerations are evaluated as part of the voting process in the competition.
- All claims of compliance with any standard, code or regulations are those made by entrants themselves. However, if a pool/hot tub/swim-spa is proved to be non-compliant - it will be immediately be removed from the competition with no return of the entry fee.
Bishops Castle Leisure and Arts Centre
The £1.15m refurbishment of the SpArC swimming pool transformed a 50-year-old community facility into a modern, accessible and sustainable aquatic venue. Delivered by Alliance Leisure on behalf of Shropshire Council, with Serco Leisure operating the facility and steering the project from inception to completion, the scheme included pool tank refurbishment, new filtration systems and accessibility improvements, securing the pool's long-term future while reducing costs.
Christina Connor Intelligent Pool House
This project is a fully integrated private wellness suite combining advanced pool engineering, Loxone automation, BESGO technology, DA-GEN salt chlorination, Calorex air handling and intelligent lighting. A Velocity swimjet, automatic Coverseal, sauna and steam room complete the experience. Despite the technical complexity, the finished space remains calm, refined and effortless to use.
Christina Connor Oasis Comfort Line™ range
Featuring a new insulation system without compromise for either the customer or their maintenance engineers, the Comfort Line™ range with iN6 sets a new standard for hot tub insulation solutions.
Wayne Green Outdoor to Indoor
Our client had a large outdoor pool that had been neglected and was in poor condition. As part of a major house refurbishment, we brought the pool indoors and transformed it into a modern swimming complex. The pool was fully retiled with new compliant fittings and pipework, a new slatted safety cover and lighting. New filtration, dosing and heating systems, including a Heatstar unit and ducting, completed the upgrade.
Christina Connor 













































