ENTRY DETAILS
Lancing College
Best Swimming Pool in an Educational Setting , Commercial Pool Refurbishment of the year
Lancing College’s 45-year-old, 25m pool needed more than a cosmetic refurbishment. The project addressed existing circulation-design issues, brought the treatment system into line with current standards and increased the pool’s usability. Over nine months, Hydrospec renewed the pool finishes and installed new filtration and controls while retaining existing plant that remained in good condition.
Why this entry deserves to win
What stands out about this project is the range of practical engineering problems that were solved within the existing pool building. The circulation system was brought into line with current standards, retained equipment in good condition was integrated with the new plant, and the backwash arrangement was designed around discharge restrictions set by the water authority. Restricted plant-room access also meant that removing the old filters and media and installing the replacements had to be carefully planned. Automatic backwashing reduces manual valve changes, variable-speed pump control helps manage energy use, and UV provides secondary disinfection while helping to reduce chloramine levels. The system was fully commissioned and independent microbiological tests returned zero counts for every organism tested. Lancing now has a renewed pool that works better behind the scenes and is ready for many more years of school, club and community use.
Design information
The aim was to bring the pool into compliance while making good use of existing services that remained in sound condition. We kept the familiar 25m × 9m layout and concentrated the engineering work on circulation, filtration, water treatment and controls. Hydrospec installed new filtration plant and integrated it with the retained chemical-treatment equipment and other existing services. Variable-speed pump control, secondary UV treatment, automatic backwashing and new electrical controls were added. The pool finishes and fittings were also renewed. This approach avoided unnecessary replacement, improved flow control and water quality, and left the College with a more reliable system that is easier to operate and maintain.
Technical information
The pool is 25m × 9m, with four swimming lanes and a wet-deck surround. It holds approximately 275m³ of water. The upgraded treatment plant runs at 95m³/h, so the full pool volume passes through the treatment system in under three hours. Filtration and circulation: The system uses two 1800mm Waterco commercial filters, providing a combined filtration area of 5.08m², together with a 5.5kW Waterco Hydrostar Plus pump. The equipment was selected to suit the existing pipework, deliver the required flow and provide straightforward future maintenance. A Danfoss variable-speed drive gives the pump a gentler start and allows it to run at a lower speed when the pool is closed for longer periods, helping to avoid unnecessary energy use. Backwashing and drainage: Pneumatically operated Besgo automatic backwash and rinse valves clean one filter at a time while the other remains in service. This gives a consistent cleaning cycle and removes the need for the operator to carry out a series of manual valve changes. The permitted backwash discharge rate was restricted under the water authority’s trade-effluent consent. To comply with this, we installed a Balmoral holding tank so the backwash water can be collected and released at a controlled rate. Water quality and heating: The existing Kuntze Neon chlorine and pH controller, Granudos 45 Touch dosing unit and FlocDos+ flocculation system were all in good condition, so there was no benefit in replacing them. We integrated them with the new plant and added an Evoqua/ATG medium-pressure UV unit sized to suit the 95m³/h flow. The UV provides secondary disinfection and helps to reduce chloramine levels. Pool water is heated through a Bowman heat exchanger. Pool finishes and safeguards: The pool basin and surrounds were re-tiled using an ARDEX waterproofing, adhesive and grout system suitable for permanently immersed areas. New safety grilles and pool fittings were also installed. Automatic water-level control, low-level pump protection, local fault indication and a common alarm connection to the building-management system help protect the equipment and make faults easier for the College team to identify. The biggest technical challenges were restricted plant-room access and bringing the old and new equipment together into one dependable system. Removing the existing filters and filter media, then moving the replacement equipment into position, required careful planning and sequencing. The existing overflow channel also had too few outlets to cope with peak bather loads, which had led to flooding during busy periods. We added additional outlets and a larger capacity hopper to improve drainage from the channel and prevent the problem recurring. We surveyed and tested the existing plant, pressure-tested the retained pipework and checked each interface before commissioning. The final tests confirmed the required flow and correct automatic backwash operation. Independent microbiological testing returned zero counts for all organisms tested. The College also received as-installed drawings, certificates, operating and maintenance information, and staff training.
Company
Hydrospec