ENTRY DETAILS
Merrievale Project
Residential Indoor Pool Of The Year (Over £175k)
This project involved the construction of a luxury indoor swimming pool as part of the construction of the clients' new private residence. Following a recommendation from a previous customer, XL Pools transformed the customers vision into a sophisticated indoor leisure suite featuring a 9.5m x 5m reinforced concrete pool, bespoke spa, and luxury sauna. Completed within a demanding nine-month programme, the project met its Christmas deadline and now exceeds expectations.
Why this entry deserves to win
This project deserves to win because it demonstrates that the success of a luxury swimming pool project is measured not only by the quality of the finished installation, but by the standard of service, attention to detail and commitment required to deliver it.The clients were highly experienced luxury property developers with exacting expectations. XL Pools was appointed through personal recommendation and entrusted with translating the architectural concept into a swimming pool and wellness environment that achieved their brief of being “glamorous, but classy.”We invested time in the details that mattered to the clients. We took them to our specialist supplier in London to personally select their mosaics, sourced specialist underwater lighting overseas rather than compromise the agreed design and worked closely with the main contractor to coordinate a technically complex installation within a rapidly progressing house build.When the construction programme created a critical deadline for installation of the environmental control equipment, our team acted proactively to secure delivery and installation before access was permanently restricted.Above all, we committed to the clients’ personal goal of completing the install
Design information
The clients’ brief was to create an indoor swimming pool that felt “glamorous, but classy.” As experienced luxury property developers, they expected exceptional quality and attention to detail. Working alongside the architect, we refined the specification, guiding the clients through key design decisions, including accompanying them to our specialist mosaic supplier to select the perfect Gin Fizz finish. Twin AquaTop solar polycarbonate automatic slatted covers were specified to minimise heat loss, reduce evaporation and improve energy efficiency, while a Heatstar environmental control system provided an economical indoor climate. When the desired underwater strip lighting became unavailable in the UK, we sourced it overseas rather than compromise the design. The completed pool, spa and sauna perfectly balanced luxury, practicality and long-term efficiency.
Technical information
This project comprises a 9.5m x 5m reinforced concrete indoor swimming pool constructed to Eurocode 2, with water depths ranging from 1.10m to 1.80m and a total water volume of 80m³. Reinforced concrete was selected to provide complete design flexibility, exceptional structural integrity and a long service life, making it the ideal solution for this bespoke indoor leisure suite. Water circulation is provided by a Zodiac FloPro 1HP single-speed pump, delivering a circulation rate of 13.5m³/hr through a Zodiac 650MS (24") filter operating at 13psi. The hydraulic design achieves a turnover period of 5.5 hours, with two Certikin anti-vortex main drains, two Certikin HD concrete skimmers and two Certikin Optimus return inlets ensuring balanced circulation, excellent surface skimming and compliance with recognised safety standards. All suction and return pipework is 55mm Class C PVC for long-term reliability and efficient hydraulic performance. Water quality is maintained using a HANNA Instruments BL-122 automatic pH and chlorine controller with remote monitoring capability, allowing precise dosing while reducing unnecessary chemical consumption. This is complemented by a Filtreau UV-C Slim 120W ultraviolet system, providing secondary disinfection, reducing chloramine formation and improving swimmer comfort through clearer, healthier water. Although the primary air source heat pump was supplied by others, XL Pools specified a 76kW Bowman titanium heat exchanger to maximise heat transfer efficiency while providing exceptional resistance to corrosion and long-term durability. Indoor environmental conditions are controlled by a Heatstar Andromeda 1000, carefully selected to regulate humidity, air temperature and condensation. This not only creates a comfortable environment for the family but also protects the building fabric and significantly improves the energy efficiency of the pool hall. Two Technics & Applications AquaTop solar polycarbonate automatic slatted covers were incorporated into the design. These minimise evaporation, dramatically reduce heat loss, improve safety when the pool is not in use and lower the overall energy required to maintain water temperature, making them a key part of the project's sustainability strategy. The greatest challenge during construction was maintaining the demanding programme. The clients wished to swim on Christmas Day, leaving no flexibility in the completion date. Close coordination with the main contractor ensured the Heatstar unit was delivered before the building was enclosed, while specialist underwater strip lighting, unavailable within the UK, was sourced overseas to preserve the original design. Through careful planning, proactive communication and close collaboration with all trades, XL Pools delivered the project on schedule without compromising quality, allowing the family to enjoy their first swim exactly as planned.
Company
XL Pools Ltd