Outdoor to Indoor

Residential Pool Refurbishment Project of the year

Our client had a large outdoor pool that had been neglected and was in poor condition. As part of a major house refurbishment, we brought the pool indoors and transformed it into a modern swimming complex. The pool was fully retiled with new compliant fittings and pipework, a new slatted safety cover and lighting. New filtration, dosing and heating systems, including a Heatstar unit and ducting, completed the upgrade.

Why this entry deserves to win

A Challenging Project with an Exceptional ResultThis project was a long time in the making. Our initial site visit took place in 2021, with construction commencing in January 2022. Due to delays associated with the main house project, the swimming pool works were not finally completed until October 2024.From the outset, site access presented a significant challenge. Whenever we required access to the pool to carry out our works, the main contractor would often scaffold over the pool to provide access for other trades working on the building. As a result, much of the rendering and tanking had to be undertaken while working beneath the scaffolding within the pool itself.We were rarely given a clear and uninterrupted period in which to progress the pool works. On numerous occasions, we had to leave site because access was unavailable or conditions prevented us from carrying out the work safely and efficiently.Throughout the project, the design team also made a number of changes to the specification for the plant room and changing facilities. This resulted in numerous meetings and revisions as the project evolved, requiring close coordination between the various designers, architects, contractors and our specialist pool team to ens

Design information

The project transformed an ageing and neglected outdoor pool into a high-quality indoor swimming facility that was fully integrated into the wider refurbishment of the property. By combining extensive structural and aesthetic improvements with modern heating, filtration, dosing, lighting and safety systems, the finished pool provided the client with a reliable, comfortable and visually impressive space for year-round use. client testimonial Tanby oversaw and implemented the complete redesign of an existing outdoor pool to turn it into a brand new indoor pool, attached to and forming part of the main house. This involved taking part in an extensive project over several years, and coordinating with various other contractors and firms working on other parts of the building to fit in with timelines set by independent project managers. ** were very easy to work with, and flexible in their timing and approach. They were very tolerant of delays on the rest of the building works, and were proactive and helpful in the design and implementation of the project. They were professional and courteous at all times, and we trusted their judgment. They have delivered a finished product that we are completely delighted with.

Technical information

pool measurements: length 13m x width 8m depth 1m - 2m constant slope filtration: 36" Waterco filter with AFM - From Certikin 2hp Certikin aquaspeed filtration pump - from Certikin Hanna instruments automatic chlorine and ph dosing unit Heatstar XF ec3000 super plus air handling system with high level ducting Paramount pools Aquadeck white slatted cover in pit housing with in-roller motor and stainless steel brackets and removable trays Paramount pools water-tech wt2 colour change lights the pool is tiled in shaded charcoal mosaics from the Mosaic Company and the copings are Mystery Bluestone from the Mosaic Company